Print this page

Twin Valley Elementary School

Elverson, PA

Use Group: Education 

Certification: LEED Silver Rating

Owner:
Owner Name/Company: Twin Valley School Dstrict
 
Project Team:
Architect: L. Robert Kimball & Associates
Consultant: 7 Group
 
Building Statistics:
Completion Date: August 2005
Size: 50,163 GSF
 
Costs:
Construction Cost: $145/GSF
 
Applicable Items from the
LEED (Leadership in Energy Efficient Design) Checklist
  
 
Sustainable Sites:
* Erosion & Sedimentation Control 
* Alternative Transportation - Bicycle Storage & Changing Rooms 
* Reduced Site Disturbance - Development Footprint 
* Landscape & Exterior Design to Reduce Heat Islands - Roof 
* Light Pollution Reduction 
 
Water Efficiency:
* Water Efficient Landscaping - Reduce by 50% 
* Water Efficient Landscaping - No Potable Use or No Irrigation 
* Water Use Reduction - 20% Reduction 
* Water Use Reduction - 30% Reduction 
 
Energy & Atmosphere:
* Fundamental Building Systems Commissioning 
* Minimum Energy Performance 
* CFC Reduction in HVAC&R Equipment 
* Optimize Energy Performance - 20% New / 10% Existing 
* Optimize Energy Performance - 30% New / 20% Existing 
* Optimize Energy Performance - 40% New / 30% Existing 
* Optimize Energy Performance - 50% New / 40% Existing 
* Ozone Depletion 
 
Materials & Resources:
* Storage & Collection of Recyclables 
* Construction Waste Management - Divert 50% 
* Recycled Content - Specify 25% 
* Local/Regional Materials - 20% Manufactured Locally 
 
Indoor Environmental Quality:
* Minimum IAQ Performance 
* Environmental Tobacco Smoke (ETS) Control 
* Low Emitting Materials - Adhesives & Sealants 
* Low Emitting Materials - Paints 
* Low Emitting Materials - Carpet 
* Low Emitting Materials - Composite Wood 
* Indoor Chemicals & Pollutant Source Control 
 
Innovation & Design Process:
* Innovation in Design - MRc 5.1 Exemplary performance 40% local material 
* Innovation in Design - Blended Cement 
* Innovation in Design - Education 
* LEED™ Accredited Professional